Skip to main content Skip to footer
Required fields are marked with asterisks (*)

Waubuno Pedestrian Bridge Condition Issue 

On June 18th, 2024, a report went to Council from staff addressing the current condition of the Waubuno Pedestrian Bridge. As directed by Council, the opportunity for public consultation on the proposed project is to occur. There are three choices to address the current condition of the Waubuno Pedestrian Bridge including removal and sloping down to grade, replacing the bridge or repairing the current bridge. Below are links to further information.

Feedback will be accepted until August 29th, 2024 at 4:30 p.m. 

OSIM Summary Report Waubuno Bridge

Recreational Info Guide

June 18th, 2024 Report to Council

2023 Additional Repairs

 

Existing Center

Proposed Center

Feedback received via email will also be accepted. Emails may be sent directly to publicworks@parrysound.ca

 

Minimum characters: 10